Power & Automation · EPC / Turnkey · 2024

Al-Zubaidiya Power Plant — Actuator Retrofit

Complete EPC project for the replacement of more than 50 Chinese electric actuators with AUMA actuators.

The challenge

Prior to this upgrade, the station suffered from a lack of spare parts and technical support, as well as recurring operational problems.

PVE scope of work

  • Evaluation of installed actuator condition and replacement requirements
  • Design and engineering
  • Dismantling and installation
  • Cable routing and termination
  • Testing and commissioning
  • Control system integration

Key challenges & engineering achievements

  1. Technical and logistical challenges

    The project faced numerous technical and logistical challenges; the PVE team resolved all issues and completed the replacement successfully.

  2. Interface adaptation

    New adaptation parts were engineered to fit AUMA actuators to the existing valves.

Equipment

AUMA electric actuators with adaptation parts

Outcome

Improved reliability, available technical support and better long-term maintainability.